Work camp for the Site C dam is a self-contained town called Two Rivers Lodge, with restaurant, theatre, lounge, gym, yoga studio and hair salon. The camp is budgeted at $470 million to build and operate. (BC Hydro)

Work camp for the Site C dam is a self-contained town called Two Rivers Lodge, with restaurant, theatre, lounge, gym, yoga studio and hair salon. The camp is budgeted at $470 million to build and operate. (BC Hydro)

Site C dam project draws criticism at first public input session

The new NDP government initiated a review of the project

An American energy consultant told the BC Utilities Commission that the Site C hydroelectric dam currently under construction in the northeast region of the province doesn’t make sense from an economic or energy production perspective.

Robert McCullough of the Oregon-based firm McCullough Research, taking part in a public input session about the $8.8-billion project in Vancouver on Saturday, said that building dams for energy is an outdated practice.

He said the cost of renewable energy sources like wind and solar have decreased dramatically in the last five years and building a dam over the Peace River doesn’t make sense.

“The era of big iron has passed,” he said “We just have had a technological change that people are adjusting to now. We can actually save $1 billion dollars by simply abandoning the project and going to other technologies.”

McCullough said his firm would also be providing the utilities commission more detailed analysis of the project.

The province’s new NDP government directed the utilities commission to review the economic viability of the megaproject that was initiated by the former Liberal premier Christy Clark.

Proponents of the project have said it will create hundreds of jobs and support the province’s future energy needs.

WATCH: Work begins on Site C generators

More than 100 people attended Saturday’s session where 34 speakers were registered to voice their perspectives to the commission.

Galen Armstrong with the Sierra Club BC said although the dam will be located on the Peace River in the northeast region of the province, everyone will be paying for it in the years to come through increased hydro rates.

The utilities commission released a preliminary report Tuesday that said BC Hydro had already spent $1.8 billion on construction by June 30 and the cost of cancelling the project would amount to $1.1 billion.

But Armstrong said those costs don’t suggest the project is past the point of no return, as it represents a fraction of the total project cost, and its cancellation would spare the environmental implications of flooding rich agricultural land.

“It’s absolutely not past the point of no return in terms of First Nations who use the land … in terms of the farmers and the potential to grow food there,” he said. “I’m very hopeful they’ll make the right choice and end this project.”

The report also raised concerns that nearly half of the project’s $794-million contingency budget has already been spent, but it also said information is lacking to determine whether the project is overall on budget.

Site C would be the third dam on the Peace River, flooding an 83-kilometre stretch of valley, and has faced fierce opposition from local First Nations, landowners and farmers.

Ten more public input sessions are scheduled across the province in the coming weeks and a final report is expected to be delivered to the government on Nov. 1.

Site C

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Lisa Werring, Surrey Christmas Bureau boss, inside the charity’s new home. (Submitted photo)
‘Toys, toys, toys, we need toys’: Surrey Christmas Bureau calls for donations

‘It’s been a challenging season to say the least. Every day is a new adventure,’ says bureau boss Lisa Werring

Sukhi Sandhu, organizer of Wake Up Surrey. (File photo)
Wake Up Surrey welcomes Lipinski as city’s new police chief

But Surrey Police Service will not solve Surrey’s gang violence on its own, Sukhi Sandhu says

(Photo: Amy Reid)
VIDEO: 2020 Community Leader Awards recognize Surrey’s unsung heroes

They don’t often receive recognition and don’t necessarily have a high profile in the community

Extras in Promises include many who currently serve in uniform in law enforcement, the military and the Canadian Border Services Agency. Contributed photo
Movie traces Punjabi soldiers’ role in battle during Second World War

Surrey director and White Rock councillor participate in film project

THE REAL PHOTO: Linda Annis, executive director with Metro Vancouver Crime Stoppers holds a note commonly posted on doors when people go on vacation. (Ashley Wadhwani/Black Press Media)
Surrey councillor slams mayor’s slate for doctoring her photo, quote in social media attack ad

Linda Annis says the Safe Surrey Coalition has been running “fake news” and a doctored photo of her in an attack ad on the slate’s twitter account and its Facebook page.

People wearing face masks to help curb the spread of COVID-19 cross a street in downtown Vancouver, on Sunday, November 22, 2020. The use of masks is mandatory in indoor public and retail spaces in the province. THE CANADIAN PRESS/Darryl Dyck
B.C. reports 17 COVID deaths, 1,933 new cases as hospitalizations surge over the weekend

There are 277 people in hospital, of whom 59 are in ICU or critical care

An aerial shot of Cedar Valley Lodge this past August, LNG Canada’s newest accommodation for workers at the project site in Kitimat. This is where several employees are isolating after a COVID-19 outbreak was declared last Thursday (Nov. 19). (Photo courtesy of LNG Canada)
Forty-one positive COVID-19 cases associated with the LNG Canada site outbreak in Kitimat

Thirty-four of the 41 cases remain active, according to Northern Health

7-year-old Mackenzie Hodge from Penticton sent a hand-written letter to premiere John Horgan asking if she’d be able to see her elf, Ralph under the new coronavirus restrictions. (John Horgan / Twitter)
Elf on the shelf an acceptable house guest, B.C. premier tells Penticton girl

A 7-year-old from Penticton penned a letter asking if she’d be allowed to see her elf this year

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Workers arrive at the Lynn Valley Care Centre seniors home, in North Vancouver, B.C., on Saturday, March 14, 2020. It was the site of Canada’s first COVID-19 outbreak in a long-term care facility. THE CANADIAN PRESS/Darryl Dyck
Rapid tests ‘not a panacea’ for care homes, Dr. Bonnie Henry says

B.C. lacks capacity for daily tests of thousands of workers

Join Black Press Media and Do Some Good
Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

A woman being arrested at a Kelowna Value Village after refusing to wear a mask on Nov. 22.(@Jules50278750/Twitter)
VIDEO: Woman arrested for refusing to wear mask at Kelowna Value Village

RCMP claims the woman was uncooperative with officers, striking them a number of times and screaming

B.C. Liberal MLA Shirley Bond questions NDP government ministers in the B.C. legislature, Feb. 19, 2020. (Hansard TV)
Cabinet veteran Shirley Bond chosen interim leader of B.C. Liberals

28-member opposition prepares for December legislature session

Motorists wait to enter a Fraser Health COVID-19 testing facility, in Surrey, B.C., on Monday, November 9, 2020. THE CANADIAN PRESS/Darryl Dyck
COVID-19: What do rising positivity rates mean for B.C.? It’s not entirely clear

Coronavirus cases are on the rise but the province has not unveiled clear thresholds for further measures

Most Read