The aging Massey Tunnel will be replaced with a bridge.

New bridge will replace Massey Tunnel, Premier Clark says

No word on tolls but decision eliminates alignment into east Richmond



A new bridge will replace the aging George Massey Tunnel but the provincial government isn’t yet saying if the span will be tolled.

Premier Christy Clark promised construction will begin in 2017 in her speech Friday at the Union of B.C. Municipalities convention.

Clark said it’s too early to say how improved transit along Highway 99 might fit into the project or whether tolls will be required to pay for it.

If the new bridge is tolled it would join the new Port Mann, the Golden Ears, and possibly the Pattullo – where tolls are also an option to pay for replacement – as Metro Vancouver bridges that motorists must pay to cross.

The premier said the province is following the advice of the public provided in consultations that a new bridge is best, rather than another tunnel.

The province is also rejecting one controversial alignment that would have crossed the river further upstream and was strongly opposed over concern it would intensify pressure to develop farmland in east Richmond.

“People said the tunnel must be replaced and it must be replaced on the same route,” Clark told UBCM, adding the project will relieve congestion on what is now “the worst bottleneck in the Lower Mainland.”

————————————————————

————————————————————

A newly released report on public feedback found “medium” support for building a new bridge and also keeping the old tunnel.

But decommissioning the 55-year-old tunnel also offers the major advantage of allowing larger ships to sail up the Fraser River, opening up expanded port use of sites in North Delta and Surrey.

Asked if Port Metro Vancouver should contribute to the cost, Clark called that “a good idea.”

The new Port Mann Bridge itself cost $830 million, not counting about $2 billion more to expanding the highway and interchanges.

It’s not yet clear if the province intends similar upgrades along Highway 99 or how many lanes are planned for the new bridge.

But a video released by the transportation ministry depicts a large 10-lane bridge with special HOV and truck lanes.

Some transit advocates have previously said they fear the new bridge will come at the cost of more transit and SFU City Program director Gordon Price predicted Friday it will add more pressure to develop farmland.

Engineering and technical work is underway to develop a project scope and business case for the new bridge and associated Highway 99 corridor upgrades, to be made public next spring.

Meanwhile, the transportation ministry plans to immediately lengthen the Steveston off-ramp at the north end of the tunnel to improve safety and ease traffic congestion there.

The announcement was applauded by Delta mayor Lois Jackson and the B.C. Trucking Association.

Clark first pledged to begin studying options to replace the tunnel at last year’s UBCM convention. The province says the tunnel has about 10 years of useful life left.

Just Posted

Mother’s death causes singer to cancel Surrey Fusion Festival performance

Revised schedule released with Mankirt Aulakh replacing Sharry Mann

New day camp for Surrey children living with cancer, blood disorders

West Coast Kids Cancer Foundation running another session at Surrey school

Cars keyed on BC Ferries after alarms bother dog on board

Delta police arrested one passenger on suspicion of mischief

TONIGHT: Eagle Eyes to headline Concerts for the Pier in White Rock

East Beach event to feature The Fab Fourever

Toilet, bathtub among junk dumped behind Scott Road thrift store, costing operators money

‘I wish people would appreciate what we do, and not dump their stuff,’ frustrated manager says

Feds lowered poverty line, reducing the number of seniors in need: documents

Liberals introduced a poverty line that was below the prior low-income cutoff

BCHL: Alberni Valley Bulldogs have been sold

Victoria company has purchased BCHL team, but will keep it in Port Alberni

“Does Kirby care?” B.C. First Nation’s group using geo-targeted ads in Houston, Texas for justice

The Heiltsuk Tribal Council has called out Kirby Corporation for the Nathan E. Stewart oil spill

Trudeau announces $79M investment for 118 more public transit buses across B.C.

Contributions from municipal to federal level to fund more buses in a bid to cut commutes

B.C. woman wins record $2.1 million on casino slot machine

‘That night was so surreal … I wasn’t able to sleep or eat for the first two days,’ she said

After B.C. dad’s death, Technical Safety BC wants changes to trampoline park rules

Jay Greenwood, 46, did ‘a series of acrobatic manoeuvres prior to a fall that caused serious injury and cardiac arrest’

$900M settlement reached in class action on sexual misconduct in Canadian military

After facing criticism, the government moved to begin settlement proceedings in early 2018

Tax take stays ahead of increased B.C. government spending

Tax revenue $2.1 billion higher than budget in 2018-19

Two toddler siblings found drowned on First Nation in Alberta

The siblings were found drowned on their family’s property, according to RCMP

Most Read