Premier John Horgan talks forest policy with Council of Forest Industries CEO Susan Yurkovich at COFI’s convention in Vancouver, April 5, 2019. (COFI)

Museum, hospital expansion to use mass timber, John Horgan says

Premier calls for new strategies for Interior forest companies

The expansion of the Royal B.C. Museum in Victoria and the replacement of St. Paul’s Hospital in Vancouver will showcase the province’s leading role in mass timber construction, Premier John Horgan says.

Speaking to the Council of Forest Industries convention in Vancouver Friday, Horgan referred to his recent visit to Structurlam’s cross-laminated timber factory in Okanagan Falls, where he announced the B.C. Building Code is being changed to increase maximum timber construction height from six storeys to 12.

“Building the new museum from B.C. wood honours the past, while showcasing our bright future in engineered wood design,” Horgan said. “I have asked that the new St. Paul’s use mass timber wherever possible, without affecting building height or view corridors.”

The museum and hospital projects are “just the beginning” for the revitalization of B.C.’s forest industry, Horgan told delegates to B.C.’s largest industry convention. Other public construction projects will also showcase B.C. technology.

READ MORE: Royal B.C. Museum faces space, seismic issues

READ MORE: St. Paul’s Hospital replacement to open in 2026

Horgan described letters he wrote to B.C. Interior forest company executives this week, inviting them to start talks with Indigenous and union leaders on how they can make more efficient use of existing licensed timber supply, which has dropped significantly in the wake of beetle epidemics across the province.

“If we don’t have a transformation from the high-volume to the high-value economy, we’re going to be in trouble,” Horgan told reporters after the speech.

He cited the decision announced by Kalesnikoff Lumber to build a new engineered timber plant in the Kootenays, which came the day after his visit to Structurlam, a pioneer of engineered wood with operations in Penticton and Okanagan Falls.

Structurlam has expanded into the United States, and is supplying mass timber components for a wide variety of projects, including Microsoft’s new campus in Mountain View, California, the heart of Silicon Valley.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Surrey tops list of most delayed, congested TransLink bus routes

TransLink says delays are costing $75 million a year

No injuries reported after ‘T-bone’ collision in South Surrey

Three-vehicle collision occurred at 184 Street and 40 Avenue intersection

Parking changes may be coming to Clayton Heights

Surrey Council to decide on pilot project

Delta Sports Hall of Fame to honour 2019’s Sport Champions

Past and present inductees will be honoured at a gala banquet in Tsawwassen on Saturday, Oct. 26

White Rock honeybee deaths prompt inspection by KPU prof

Researcher Cameron Lait unable to provide diagnosis due to lack of evidence – but has a theory

B.C. woman must pay $1,000 after her unleashed dog bites Muffin

Owner should never have left Bibi unattended, tribunal member wrote

Climate activist Greta Thunberg’s mural defaced in Edmonton

The eyes on the portrait were blacked out

LETTER: Middle class better off with Trudeau’s child benefit boost

It’s a transfer, not a tax cut, but it helps families get ahead

VIDEO: Depth and scoring lacking for Vancouver Giants this season: Coach

G-Men defeated on home ice Sunday by Victoria – next up Everett on Friday

Report suggests new BC Ferries terminal near YVR

Metro Vancouver currently has two ferry terminals at northern and southern reaches

B.C. scouting group’s tent destroyed by black bear on Thanksgiving

The Richmond-based Sea Dragon Sea Scouts were camping at Mount Seymour Provincial Park

Greta Thunberg meets with First Nations chief in Fort McMurray

Thunberg has turned her protest against climate change into a global movement

Most Read